Week of June 18, 2012

The footings and foundation have been poured and all forms are off.  The center support beam is in place.  The sill plates have been cut and drilled.  We will put in the floor joists and floor sheathing and get to the framing as soon as is possible.

This entry was posted in Uncategorized. Bookmark the permalink.